Project Name:
Consultancy Services for Initial Environmental Examination (IEE) for Bioelectricity Production from Poultry Litter of Zubaida Poultry Ltd. |
Country: Bangladesh |
Project Duration: 07/2014 to 08/2014 |
Description of Project:
The proposed Project involves setting up of one (01) biogas-based electricity generation plant by Zubaida Poultry Ltd. (ZPL) in Shashanpara in Sadar Upazilla of Chuadanga district. Electricity generated from the Project will be used by the farm for satisfying captive demand of electricity in poultry sheds and office building by running one 25 kW biogas generator. Poultry waste produced by the poultry farm will be used as feed material in the biogas digester for production of gas which, after purification, will be used to run the biogas generator. The slurry produced as byproduct from the biogas digester will be sold in the local market after reducing water component as organic fertilizer. |
Description of Actual Services Provided by Staff of this Firm in the Assignment:
The scope of the services shall comprise:
1. Carryout Environmental and Social Survey in the project influenced area as per the TOR. 2. Carryout Focus Group Discussions and Stakeholder Consultations. 3. Preparation of Baseline Environmental Survey & Consultation Report. 4. Review of existing information (relevant all documents). 5. Provide a full description of the project (such as project location, layout, components, construction materials, etc.). 6. Provide a description of the environment. 7. Analysis of alternatives to the proposed project. 8. Address occupational health and safety (H&S) requirements. 9. Ensure that all provisions of GOB and WB applicable policies are complied with. 10. Devise a mitigation plan for all project-related impacts and 11. Prepare IEE in accordance with the GOB & DOE Policies. |
House# 734 (1-A), Road# 10, Avenue# 04, DOHS Mirpur, Dhaka-1216, Bangladesh
+88 01822758548
+8809617035444