Project Name:

Consultancy Services for IEE and EIA of One (01) Assessment well (Zakiganj-2) and Two (02) Exploration Well (Fenchuganj South-1 And Mubarakpur South-East-1) Development Project.

Country:  Bangladesh
Project Duration: 01/2023 to 03/2023
Description of Project:

Bangladesh Petroleum Exploration and Production Company Ltd (BAPEX), (A company of Petro Bangla) intended to undertake an Initial Environmental Examination (IEE) for “01 Assesment Well (Zakiganj-2) and 02 Exploration Wells (Fenchuganj South-1 & Mobarakpur South East-I) Drilling Project at 03 districts (. Upazila: Sylhet, Distric: Sylhet, ii. Upazila: Rajnagar, District: Moulvibazar iii. Uapazila: Sujanagar, District: Pabna)

The current average production of natural gas is about 2644 mmcfd. A total 965 billion cubic feet (BCF) of natural gas was produced in 2018-19 which was used by power- 43%, fertilizer-5.5%, captive power-15%, industry-16%, domestic-15%, CNG – 4% and others very small amount. Natural gas accounts for the 68.5% grid electricity generation while all the 7 urea fertilizer factories are dependent on natural gas for feedstock. (Source: Energy and Mineral Resources Division, Ministry of Power, Energy and Mineral Resources)

Bangladesh consumes 6,531 cubic feet of natural gas per capita every year (based on the 2017 population of 159,685,424 people), or 18 cubic feet per capita per day. (Source: Worldometer) Current energy policy and the development plans are focused to reduce import of petroleum products and thereby pressure on the foreign exchange through exploration, production and marketing of natural gas. The main objective of drilling project is to increase gas production to meet the high demand of natural gas. BAPEX plans to undertake exploration and development wells drilling to gather data on the potential for future gas exploration and development. Drilling operations will be designed to further determine the extent of gas within the project area

Assessing the extent of gas within the exploration area of Zakiganj-2 project area may confirm additional gas reserves in Bangladesh and allow for future informed decisions to be made on future investment into gas exploration or development of gas wells.

Description of Actual Services Provided by Staff of this Firm in the Assignment:

The consultancy services required under this project refers to the preparation of Initial Environmental Study (IEE) and Environmental Impact Assessment (EIA) report according to the requirement of the Bangladesh Government’s for the project along with obtaining Environmental Clearance Certificate (ECC) from Department of Environment (DoE).

The delivery of the services has been divided into the following task and its sub-tasks.

Task 1: Mobilization and Inception.

► Task 1a: Documentation of Existing Environmental Conditions.

► Task 1b: Legislative and Regulatory Considerations

Task 2: Detail Survey for Identification of Environmental and Social Features.

► Task 2a: Assessment of Environmental Significance of the Project Area.

► Task 2b: Environmental Quality Sampling and Testing.

► Task 2c: Assessment of Agricultural Impact.

► Task 2d: Assessment of Ecology and Impacts.

► Task 2e: Assessment of Socio-economic Status of the Project Area.

► Task 2f: Stakeholder Consultations.

• Task 3: Climate Change Resilient and Adaptation Assessment.

• Task 4: Impacts Assessment and Development of Mitigation Measures.

• Task 5: Analysis of Alternatives to the Proposed Project.

• Task 6: Establish an Environmental Management Plan (EMP).

• Task 7: Preparation of IEE Report and Submission.