Project Name:
Consultancy Services for IEE and EIA of IEE and EIA of 2 development cum assessment well (Sundalpur-4 and Srikail-5) and 2 Exploration Well (Sundalpur South-1 and Jamalpur-1) Development Project. |
Country: Bangladesh |
Project Duration: 01/2023 to 03/2023 |
Description of Project:
BAPEX plans to drill 02 development cum evaluation wells (Sundalpur-4 and Srikail-5) and 02 exploration wells (Sundalpur South-1 and Jamalpur-1) to ensure energy security in the larger interest of the nation. Sundalpur-4 development and evaluation well in Nabipur Union under Senbag upazila of Noakhali district, Srikail-5 development and evaluation well in Srikail union under Muradnagar upazila of Cumilla district, Sundalpur South-1 exploration well in Rampur union under Companiganj upazila of Noakhali district and Jamalpur-1 exploration well under Madarganj upazila of Jamalpur district. Belongs to Balijuri Union. The current average production of natural gas is about 2644 mmcfd. A total 965 billion cubic feet (BCF) of natural gas was produced in 2018-19 which was used by power- 43%, fertilizer-5.5%, captive power-15%, industry-16%, domestic-15%, CNG – 4% and others very small amount. (Source: Energy and Mineral Resources Division, Ministry of Power, Energy and Mineral Resources). Subject to oil/ gas discovery, the project will increase additional 481.92 (approx.) BCF of recoverable gas reserves and produce gas at an average rate of 55 mmscf per day. Through the implementation of this project, besides increasing the efficiency of BAPEX’s manpower, institutional development will also be achieved. Similarly, the new industrial plants in the area are institutionally stronger as industrial production will increase. As a result, BAPEX will be established internationally as more efficient company in energy and mineral resource exploration activities and exploration activities will continue as previous. If gas is discovered by drilling wells, it is possible to ensure the country’s energy needs. As a result, new industrial factories will be developed and social development is possible with the opportunity of more employment. |
Description of Actual Services Provided by Staff of this Firm in the Assignment:
The consultancy services required under this project refers to the preparation of Initial Environmental Study (IEE) and Environmental Impact Assessment (EIA) report according to the requirement of the Bangladesh Government’s for the project along with obtaining Environmental Clearance Certificate (ECC) from Department of Environment (DoE). The delivery of the services has been divided into the following task and its sub-tasks. Task 1: Mobilization and Inception. ► Task 1a: Documentation of Existing Environmental Conditions. ► Task 1b: Legislative and Regulatory Considerations Task 2: Detail Survey for Identification of Environmental and Social Features. ► Task 2a: Assessment of Environmental Significance of the Project Area. ► Task 2b: Environmental Quality Sampling and Testing. ► Task 2c: Assessment of Agricultural Impact. ► Task 2d: Assessment of Ecology and Impacts. ► Task 2e: Assessment of Socio-economic Status of the Project Area. ► Task 2f: Stakeholder Consultations. • Task 3: Climate Change Resilient and Adaptation Assessment. • Task 4: Impacts Assessment and Development of Mitigation Measures. • Task 5: Analysis of Alternatives to the Proposed Project. • Task 6: Establish an Environmental Management Plan (EMP). • Task 7: Preparation of IEE Report and Submission. |
House# 734 (1-A), Road# 10, Avenue# 04, DOHS Mirpur, Dhaka-1216, Bangladesh
+88 01822758548
+8809617035444