Transport

Consultancy services for, Feasibility study of Rehabilitation/Maintenance of Railway track and Feasibility study along with detail design for Rehabilitation/ Reconstruction of the Bridges in Eastern Zone of Bangladesh Railway. Initial Environmental Examination (IEE), Environmental Management Plan (EMP), Traffic Survey

Consulting Services for “The Data Collection Survey for Strengthening Framework of Operation and Implementation of the Moheshkhali-Matarbari Integrated Infrastructure Development Initiative in People’s Republic of Bangladesh.

Consulting Services for Traffic Studies (including Traffic Survey) and Traffic Modeling, EIA, SIA, LAP and RAP Services.

Feasibility Study, Detailed Design and Tendering Support of Technical Assistance for Sub Regional Road Transport Project Preparatory Facility-II under ADB Loan 3295-BAN: Additional Financing to the Sub regional Transport Project Preparatory Facility (SRTPPF-II). Traffic Survey and Report Preparation.

Consulting Services for Traffic Studies (including Traffic Survey) and Traffic Modeling for Chittagong Port Access Road.

Feasibility Study, Detailed Design and Tendering Support of Technical Assistance for Sub-Regional Road Transport Project Preparatory Facility-II under ADB Loan 3295-BAN: Additional Financing to the Sub regional Transport Project Preparatory Facility (SRTPPF-II). Environmental Survey, Traffic Survey and Report Preparation.

Consulting Services for Traffic Studies by Expert Input (Traffic Engineer/Modeller for Road 8: Rangpur – Burimari Road (Length 127.9 km) and detailed tasks (f & g) for Road 9: Dauladia-Faridpur-Barisal Road (Length 156.7 km).

Ambient Air Quality Monitoring Services for Padma Multipurpose Bridge Project

Consulting Services for Environmental Impact Assessment (EIA), Resettlement Action Plan (RAP) & Land Acquisition Plan (LAP) for the Construction of Bridge at 17th km of Kochua-Betagi-Patuakhali-Lohalia-Kalaya Road (Z8052) (At Pairakunju Ferryghat) Over Paira River; funded by GoB The bridge length: 1.7Km.