Project Name:

Consultancy Services for Initial Environmental Examination (IEE) for 14-stored Grand Bengal Hotel at Uttara

Country:  Bangladesh
Project Duration: 08/2017 to 10/2017
Description of Project:

There are 14 storied building with 2 basements and will be constructed.

With its central location, Grand Bengal Hotel Ltd., Dhaka is within easy reach of most tourist attractions and business addresses in Dhaka.

Each of the 90 well-furnished guestrooms at the hotel ensures a comfortable stay with international-standard room amenities.

Room amenities include hair dryer, air conditioning, in room safe, internet access – LAN.

Hotel facilities offered at this Dhaka accommodation include laundry service/dry cleaning, 24hr room service, bar/pub, meeting facilities.

To unwind, guests can enjoy the leisure facilities provided on the hotel’s property, including Jacuzzi, outdoor pool and Gym.

With elegant facilities and hospitality, guests at this hotel will surely have an impressive stay.

Description of Actual Services Provided by Staff of this Firm in the Assignment:

Scope of Services included –

§  Collection of necessary information and relevant data for preparing the Initial Environmental Examination (IEE).

§  Collection of primary data, including extrapolation environmental features on proposed project design, tree inventories, location and measurement of socio-cultural features adjoining the proposed project area.

§  Collection of the secondary data on macro-environmental setting, such as, climate (temperature, rainfall, humidity, & wind speed), physiography, geology etc. from secondary sources.

§  Review of the environmental legislation, regulatory policy & guidelines, and considerations relating to the implementation of the project.

§  Carry out the environmental and social impact assessment up to 5km area on each side of the project.

§  Establish the environmental and social baseline conditions of the project.

§  Assessment of the baseline environmental and social condition through field surveys and investigation (sampling & testing).

§  Impacts assessment of ecologically sensitive areas (e.g., wildlife sanctuaries, biosphere reserve, and protected places).

§  Environmental quality assessment of terrestrial and aquatic ecology, soil quality (parameters – oil & grease, arsenic), surface water quality (parameters – pH, TDS, DO, BOD, COD), groundwater quality (parameters – pH, Arsenic, TDS, Alkalinity, Fe, Chloride), air quality (parameters – SPM, Sox, NOx, CO, PM10, PM2.5), and noise level to prepare a baseline database.

§  Assess the existing physical environment, biological environment, and socio-economic environment.

§  Physical environment covered different physical natural features and included major parameters & factors, such as, climate (temperature, rainfall, humidity, wind speed, sunshine, & cloud coverage), ambient air quality, noise level, physiography, topography, geology & hydrology, water resources (surface & ground water), soil quality, agro-ecological zones (soil condition, & floodplain), seismicity, etc.

§  Biological environment covered factors related to life and included major features, such as, bio-ecological zones (major rivers), ecosystem, flora & fauna, protected areas & red book species, etc.

§  Socio-economic environment covered anthropological factors, such as, demography, age, sex/gender, household, nutrition, religion, ethnicity, land use ownership, cropping pattern, occupational pattern, livelihood, income, infrastructure, settlement plan & housing, transport & communication, sources of drinking water, sanitation facility, poverty, health, recreational activities, archaeological & cultural heritage, climate change & natural disaster, environmental & social hotspot, etc.

§  Prepare socio-economic profile and impact on the community.

§  Identification and assessment of potential impacts on the natural and human environment in the project area during pre-construction; construction and post-construction phase of the project.

§  Identification of mitigation measures for minimizing the effect of the negative impacts and enhancement measures for increasing the benefits of the positive impacts.

§  Organize public consultation to explain the local environmental & social conditions and pertinent impacts.

§  Public consultation was conducted to understand the people’s perception, view and suggestion on the project.

§  Assessment of environmental, economic, and social benefits that will contribute towards long-term global sustainability.

§  Preparation of the recommendations and conclusions in order to operate the project works in an environmentally safe and sound manner.

§  Preparation of the TOR (Terms of Reference) for site clearance by the DOE.

§  Preparation of the IEE Report, including Environmental Management Plan (EMP) and Environmental Monitoring Plan, along with the budgetary cost estimates for the proposed mitigation measures and monitoring plan, in compliance with the DOE guidelines.

§  Successfully Received Site Clearance (SC) and Environmental Clearance Certificate (ECC) from Department of Environment (DoE).