Project Name:

Consultancy Services for Environmental Safeguard Monitoring Reports and Environmental Quality Test for Construction of 26km long x 36˝ OD 1000 Psig High Pressure Natural Gas Transmission Pipeline from Moddho Mogadia, Mirsharai, Chittagong to Kosba, Feni Sadar, Feni (Section-C) under Construction of Chittagong-Feni-Bakhrabad Gas Transmission Parallel Pipeline Project.

Country:  Bangladesh
Project Duration: 01/2019 to 07/2019
Description of Project:

The project will consist of about 181km, 36-inch gas transmission pipeline from Chittagong to Bakhrabad, southeast of Bangladesh. The gas transmission pipeline route will traverse the districts of Chittagong, Feni, and Comilla covering 11 sub districts. The safeguard monitoring studies will cover Section–C of the project project which will consists of about 26 km and the gas transmission pipeline route will traverse from Moddho Mogadia, Mirsharai, Chittagong to Kosba, Feni Sadar and Feni.

Description of Actual Services Provided by Staff of this Firm in the Assignment:

Services included:

ØEnvironmental monitoring of various issues due to project activities, such as, environmental pollution (dust, noise, and water); issues as listed in the EMP; provision of safe water, sanitary toilet facility and hygienic accommodation for workers at camp sites; provision of adequate occupational health, safety, and fire safety facilities; flora & fauna; waste management system; drainage system & vegetation. Carry out environmental quality monitoring sampling and testing.

ØAmbient Air Quality Monitoring (PM10, PM2.5, NO2, SO2) for one (01) location – 2 (two) hours duration; the total number will be three (03) times (one during preconstruction phase and two during construction phase)

ØNoise Level Measurement one (01) location – 10 (ten) minutes duration, only daytime; the total number will be three (03) times (one during preconstruction phase and two during construction phase)

ØDrinking Water Quality Test (pH, EC, As, Fe, Cr, Pb, Total Coliform, Oil & Grease) for one (01) location. The total number will be two (02) times (one during preconstruction phase and one during construction phase)

ØSoil Quality Test (pH, nutrients – N, P, K) for one (01) location and only during preconstruction phase.

ØLiquid Waste Test (pH, EC, Cr, Pb, Turbidity, TDS, BOD, Oil & Grease) for one (01) location and only during construction phase.

ØPreparation of seven (07) Environmental Monitoring Reports for the duration of February 2019 to August 2019.

Leave a Reply

Your email address will not be published. Required fields are marked *