Project Name:

Consultancy Services for Environmental Safeguard Monitoring and Environmental Quality Test for Construction of Gas Transmission Pipeline under River Crossing at Little Feni, Muhuri, Dakatia, and Khalidas Rivers where HDD works will be done under Construction of Chittagong-Feni-Bakhrabad Gas Transmission Parallel Pipeline Project

Country:  Bangladesh
Project Duration: 01/2019 to 10/2019
Description of Project:

The project will consist of about 181km, 36-inch gas transmission pipeline from Chittagong to Bakhrabad, southeast of Bangladesh. The gas transmission pipeline route will traverse the districts of Chittagong, Feni, and Comilla covering 11 subdistricts. The safeguard monitoring studies will cover Construction of Gas Transmission Pipeline under River Crossing at Little Feni, Muhuri, Dakatia, and Khalidas Rivers where HDD works will be done and that will traverse the districts of Comilla and Feni covering upazilla of Laksham in Nangalkot and Feni Sadar

Description of Actual Services Provided by Staff of this Firm in the Assignment:

Ø Environmental monitoring of various issues due to project activities, such as, environmental pollution (dust, noise, and water); issues as listed in the EMP; provision of safe water, sanitary toilet facility and hygienic accommodation for workers at camp sites; provision of adequate occupational health, safety, and fire safety facilities; flora & fauna; waste management system; drainage system & vegetation. Carry out environmental quality monitoring sampling and testing.

Ø Ambient Air Quality Monitoring (PM10, PM2.5, NO2, SO2) for four (04) location – 2 (two) hours duration; the total number will be eight (08) (four during preconstruction phase and four during construction phase)

Ø Noise Level Measurement four (04) location – 10 (ten) minutes duration, only daytime; the total number will be eight (08) (four during preconstruction phase and four during construction phase)

Ø River Water Quality Test (pH, DO, Turbidity, Temperature, EC, BOD and Oil & Grease) for four (04) location; the total number will be eight (08) (four during preconstruction phase and four during construction phase).

Ø Drinking Water Quality Test (pH, EC, As, Fe, Cr, Pb, Total Coliform) for four (04) location; the total number will be eight (08) (four during preconstruction phase and four during construction phase).

Ø Soil Quality Test (pH, nutrients – N, P, K) for four (04) location and only during preconstruction phase.

Ø Liquid Waste Test (pH, EC, Cr, Pb, Turbidity, TDS, BOD, Oil & Grease) for four (04) location and only during construction phase.

Ø Preparation of One Baseline Environmental Monitoring Report during preconstruction phase and Nine (9) Monthly Environmental Monitoring Reports during construction phase.