

Project Name:
Consultancy Services for Feasibility Study and Detail Design of Swarighat Bridge (2nd Babubazar Bridge) on 10th KM of Gabtoli-Swarighat National Highway (N-530) under planning and Data Circle of Bridge Management Wing |
Country: Bangladesh |
Project Duration: 07/2024 to Till Date |
Description of Project:
The Roads and Highways Department (RHD) has received government funding for the “Consultancy Services for Feasibility Study and Detailed Design of Swarighat Bridge (2nd Babubazar Bridge) on the Gabtoli-Swarighat National Highway (N-530),” under the Planning and Data Circle of the Bridge Management Wing. This project envisions constructing a state-of-the-art bridge over the Buriganga River, with an approximate total length of 3.0 km, including approach roads and viaducts on both sides. Situated on the alignment of the Dhaka Inner Circular Road, the 2nd Babubazar Bridge is critical for connecting the northern and southern regions via the Padma Bridge while bypassing central Dhaka. This bypass route aims to ease congestion by providing a direct north-south connection, supporting the city’s decongestion strategy and aligning with the national master plan. |
Description of Actual Services Provided by Staff of this Firm in the Assignment:
Services included: Topographic Survey
Data Collection and Analysis for Traffic Survey
Data Collection and Analysis for Socio-Economic Survey
Data Collection and Analysis for Environmental Survey (EIA) and Process for DOE Clearance
Data Collection and Analysis for Land Acquisition Survey (LAP)
Data Collection and Analysis for Resettlement Action Plan (RAP) Survey
Video Data Collection (Drone Video)
Report
|