Transport

 

Project Name:

Consultancy Services for Feasibility Study and Detail Design of Swarighat Bridge (2nd Babubazar Bridge) on 10th KM of Gabtoli-Swarighat National Highway (N-530) under planning and Data Circle of Bridge Management Wing

Country:  Bangladesh
Project Duration: 07/2024 to Till Date
Description of Project:

The Roads and Highways Department (RHD) has received government funding for the “Consultancy Services for Feasibility Study and Detailed Design of Swarighat Bridge (2nd Babubazar Bridge) on the Gabtoli-Swarighat National Highway (N-530),” under the Planning and Data Circle of the Bridge Management Wing. This project envisions constructing a state-of-the-art bridge over the Buriganga River, with an approximate total length of 3.0 km, including approach roads and viaducts on both sides. Situated on the alignment of the Dhaka Inner Circular Road, the 2nd Babubazar Bridge is critical for connecting the northern and southern regions via the Padma Bridge while bypassing central Dhaka. This bypass route aims to ease congestion by providing a direct north-south connection, supporting the city’s decongestion strategy and aligning with the national master plan.

Description of Actual Services Provided by Staff of this Firm in the Assignment:

Services included:

Topographic Survey

  • Conducting detailed topographic surveys to collection accurate geographical data of the project area.
  • Using modern surveying equipment and technologies to map the land features, elevations, and structures.

Data Collection and Analysis for Traffic Survey

  • Collection of traffic data to understand current and projected traffic volumes.
  • Analyzing traffic patterns and assessing the impact of the proposed bridge on traffic flow.

Data Collection and Analysis for Socio-Economic Survey

  • Collection of socio-economic data to evaluate the impact of the bridge on local communities.
  • Analyzing demographic, economic, and social factors to inform the design and planning process.

Data Collection and Analysis for Environmental Survey (EIA) and Process for DOE Clearance

  • Collection data on environmental quality and ecological data to establish baseline condition.
  • Preparing documentation and obtaining Site Clearance Certificate (SCC) from the Department of Environment (DOE).

Data Collection and Analysis for Land Acquisition Survey (LAP)

  • Identifying land parcels required for the bridge construction.
  • Assessing the legal status, ownership, and valuation of the land.
  • Facilitating the land acquisition process by coordinating with relevant authorities and stakeholders.

Data Collection and Analysis for Resettlement Action Plan (RAP) Survey

  • Conducting surveys to identify affected persons and properties.
  • Ensuring compliance with national and international resettlement standards.

Video Data Collection (Drone Video)

  • Using drones to capture high-resolution video footage of the project area.
  • Analyzing drone footage to supplement topographic and other survey data.
  • Providing visual documentation for planning and design purposes

Report

  • Environmental Impact Assessment (EIA) & obtaining Site Clearance Certificate (SCC) from the DoE,
  • Social Impact Assessment (SIA),
  • Land Acquiaition Plan (LAP),
  • Resettlement Action Plan (RAP),
  • Video Survey (Drone)
  • Traffic Study
  • Topographic Survey,

 

Environmental Quality Test under Emergency Assistance Project: Improvement of National Highway (N1) From Unchiprang (Ch: 431+494) to Teknaf (Ch: 462+254)

Environmental Quality Test under Widening of Road and Construction of Elevated Road from Panchaboti to Mukterpur Bridge Project

Preparation of Environmental and Social Impact Assessment (ESIA) including Environmental and Social Management Plan (ESMP) Construction Supervision Services of “Construction of New Dual Gauge Railway Siding Line from Ghorashal Railway Station to Polash Urea Fertilizer Factory” including Defect Liability Period

Traffic Survey (Overall Road), Socio-Economic Survey (Bridges), Environmental Survey, Lap Survey (Bridge Diversion Area), Video Data Collection, Bridge preliminary Survey/Reconnaissance Survey Under Consultancy Services for Feasibility Study, Hydromorphology study and conceptual Design for Replacement of Damaged/Narrow/Temporary Bridges and Culverts of Mymensingh Zone

Consultancy Services for Site Reconnaissance Survey for Construction of Container and Cargo Terminal at Mongla Port.

Consultancy Services for Initial Environmental Examination (IEE) and Social and Resettlement Survey including FGD, Household survey & KIIs for Emergency Assistance Project: Rehabilitation of 80.76 km National Highway (N1) From Link Road (Cox’s Bazar) to Teknaf; Funded by ADB

Consultancy Services for Environmental Assessment, GIS Mapping, and Consultations Services for Feasibility Study, Detailed Design and Tendering Support of Technical Assistance for Subregional Transport Project Preparatory Facility (SRTPPF-II) Project

Consultancy Services for Identification of Required Noise Barrier by Noise Modeling for Construction or Installation of Noise Barrier for Dhaka Elevated Expressway PPP Project.