Project Name:
Consultancy Services for Environmental Quality Test of Environmental Assessment for Promoting large scale adoption of energy saving technologies and equipment for textile sectors at Multifabs Limited in Noyapara Kashimpur, Konabari, Gazipur; funded by Infrastructure Development Company Limited (IDCOL) |
Country: Bangladesh |
Project Duration: 06/2019 to 07/2019 |
Description of Project:
Promoting large scale adoption of energy saving technologies and equipment for textile sectors at Multifabs Limited, Noyapara Kashimpur, Konabari, Gazipur; funded by Infrastructure Development Company Limited (IDCOL) |
Description of Actual Services Provided by Staff of this Firm in the Assignment:
Services included: · Air Quality Measument-8 Hours (SPM, CO, CO2, NOx, Sox, PM2.5, PM10) · Wastewater (Color, DS, COD, TSS, BOD, pH, temperature, As, Cd, Cr, Cu, Hg, Ni, Pb, Zn) · Nuisance: Noise Level, Vibration, Light, Temperature, and Humidity · Soil/Sludge Quality (As, Cd, Cr, Cu, Hg, Ni, Pb, Zn) · Drinking Water: pH, Temperature, Turbidity, Chloride (Cl-), Iron (Fe, Total Dissolved Solids (TDS), Total Hardness as CaCO3, Arsenic (As), Color, Manganese (Mn), Nitrate-Nitrogen (NO3-N) · Preparation of one environmental quality test report |
House# 734 (1-A), Road# 10, Avenue# 04, DOHS Mirpur, Dhaka-1216, Bangladesh
+88 01822758548
+8809617035444