Project Name:

Environmental Quality Survey – Air, Noise, Water of Mohra WTP to Mirsarai

Bangabandhu Sheikh Mujib Shilpa Nagar Transmission Line

Country:  Bangladesh
Project Duration: 08/2020 to 12/2020
Description of Project:

For the purpose of data collection and Preparation of Environmental Impact Assessment (EIA) for the proposed of Mohra WTP to Mirsarai Bangabandhu Sheikh Mujib Shilpa Nagar Transmission Line Project, Development Solutions Consultant Limited (DSCL) has been engaged by Dev Consultants Ltd. as a sub-contractor to perform the baseline environmental quality survey for the project. The DSCL was commenced the mobilization of the project team immediately after the award of the consultancy services contract on 24 August 2020. The field work was carried out from 29 to 03 August 2020.

Description of Actual Services Provided by Staff of this Firm in the Assignment:

The assignment’s scope comprises collecting the Environmental quality samples from the proposed Transmission line alignment and prepare an environmental quality analysis report for the purpose of preparing an Environmental Impact Assessment (EIA).

The following studies were conducted:

·        Air Quality analysis in six (06) proposed Location

·        Noise level Monitoring in six (06) location for day and nighttime

·        Collection of surface water from five (05) project influence locations

·        Collection of Groundwater from five (05) project influence locations

·        Preparation of Environmental Quality Test Reports

Leave a Reply

Your email address will not be published. Required fields are marked *