Project Name:

Consultancy Services for Environmental Monitoring and Quality Test for Installation of Two (02) Town Bordering Station (TBS) and One (01) Metering Station Under Construction of Chittagong-Feni-Bakrabad Gas Transmission Parallel Pipeline Project

Country:  Bangladesh
Project Duration: 01/2020 to 11/2021
Description of Project:

Natural gas is a significant source of commercial energy in Bangladesh and is the prime mover of its national economy. There is a growing demand for a steady and reliable supply of natural gas in the Southeast region to support its industrialization and commercial developments. The Government of Bangladesh (GoB) has recognized this need and considers it a priority to expand the gas transmission capacity in this region. The growing demand for natural gas by the industrial centrist in Chittagong, Noakhali, Comilla and adjoining areas is not sustained by the Gas Transmission Company Limited (GTCL). At present, the existing Chittagong Bakhrabad gas transmission pipeline is not adequate to meet the supply of gas for distribution in this region. The Project aims to increase the contribution of the energy sector to sustainable economic growth by financing the improvement of efficiency in gas production from existing gas field, and expansion of transmission pipeline capacity through construction of gas transmission pipelines.

DSCL was engaged to conduct Baseline Environmental Quality Monitoring and Safeguard Monitoring for single (1) time immediately after project commencement; regular environmental quality monitoring and safeguard monitoring throughout the 12 months construction period on quarterly basis (every 3 months) for 04 times; monitor the environmental safeguards of the project area; monitor the occupational and public health & safety in & around the project area; monitor the environmental pollution in the project area due to the construction activities; and accordingly preparation of one (1) Baseline Environmental Quality and Safeguard Monitoring Report and 04 Environmental Quality and Safeguard Monitoring Report at the end of every time.

The environmental quality monitoring activities included: liquid water sampling & quality testing, groundwater sampling & quality testing, ambient air quality monitoring (2 hours duration), ambient noise level measurement, The environmental quality monitoring scope was according to the Environmental Management Plan (EMP) as included in the technical specifications of the Civil Works Contract. The sampling locations was specified by the clients

Description of Actual Services Provided by Staff of this Firm in the Assignment:

 

Services included:

§ Environmental monitoring of various issues due to project activities, such as, environmental pollution (dust, noise, and water); issues as listed in the EMP; provision of safe water, sanitary toilet facility and hygienic accommodation for workers at camp sites; provision of adequate occupational health, safety, and fire safety facilities; flora & fauna; waste management system; drainage system & vegetation.

§ Carry out environmental quality monitoring sampling and testing.

§ Conduct ambient air quality monitoring for 2 hours duration each at three locations and carry out testing of defined parameters, such as Nitogen Di-oxide (NOx), Sulphur Di-oxide (SOx), Particulate Matter (PM10) and Particulate Matter (PM2.5).

§ Air quality monitoring conducted single (1) time for baseline environmental quality monitoring and 04 times on quarterly basis for environmental quality monitoring. Laboratory test by DSCL at in-house laboratory or at site by field testing kit.

§ Collection of liquid water samples from three locations and carry out testing of defined parameters, such as pH, Electric Conductivity (EC), Chromium (Cr), Lead (Pb), Turbidity, TDS, BOD, Oil and Grease.

§ Liquid water quality monitoring conducted for 04 times on quarterly basis for environmental quality monitoring. Laboratory tests at Bangladesh University of Engineering and Technology (BUET) laboratory and Department of Public Health Engineering (DPHE) laboratory; and some by DSCL at in-house laboratory or at site by field testing kits.

§ Collection of groundwater samples from three locations and carry out testing of defined parameters, such as pH, Electric Conductivity (EC), Iron (Fe), Chromium (Cr), Lead (Pb), Arsenic (As), Total Coliform (TC) and Oil & Grease.

§ Groundwater quality monitoring conducted single (1) time for baseline environmental quality monitoring and 04 times on quarterly basis for environmental quality monitoring. Laboratory tests at Bangladesh University of Engineering and Technology (BUET) laboratory and Department of Public Health Engineering (DPHE) laboratory; and some by DSCL at in-house laboratory or at site by field testing kits.

§ Carry out ambient noise level measurement at 3 locations during the day (10 minutes duration in each time).

§ Noise level measurement conducted single (1) time for baseline environmental quality monitoring and 04 times on quarterly basis for environmental quality monitoring. Laboratory test by DSCL at in-house laboratory or at site by field testing kit.

§ Analysis of environmental quality sampling test results.

§  Preparation of one (1) Baseline Environmental Quality Monitoring Report and 04 Environmental Quality and Safugraed Monitoring Report at the end of every time, including the analysis result of surface & ground water quality testing, air quality monitoring, soil quality, monitoring and noise level measurement.

§ Environmental monitoring of various issues due to project activities, such as, environmental pollution (dust, noise, and water); issues as listed in the EMP; provision of safe water, sanitary toilet facility and hygienic accommodation for workers at camp sites; provision of adequate occupational health, safety, and fire safety facilities; flora & fauna; waste management system; drainage system & vegetation.

§ Preparation of monthly Environmental Monitoring and Liaison with Client for project activities, reports & invoices submission and follow up payment.